Nationwide Children’s Hospital

Sauer and another mechanical contractor were selected on a team basis to provide preconstruction services, hydronic piping, sheet metal and controls for the new Patient Tower. The team was selected and worked through the preconstruction phase to generate value alternates and recommend system options which reduced the cost significantly.

Kennedy Space Center

The launch mount is a fully welded plate structure with stainless steel blast shielding mounted to the top surface and the flame duct opening. Its final resting spot is atop the NASA’s new mobile launch pad structure that was initially built to service the ARES 1 rocket.

Wexner Medical Center

The Ohio State University selected Sauer as part of a team to provide Design Assist HVAC piping and Plumbing for the new Wexner Medical Center complex. This project was a 1.1 million square foot Critical Cancer Care Center Tower with both clinical spaces and patient rooms.

Riverside Methodist Hospital

This project consisted of the installation of a new 40,000 lb/hr steam boiler at Riverside Methodist Hospital’s Central Plant that provided integration design and coordination with the existing boilers in the plant.

Scitech Class 100 Clean Room

This facility was designed to provide Class 100 Clean Room research and development space. The building contained an 8,000 sq. ft. laboratory, four (4) 1000 sq.ft. Class 100 Clean rooms, and a central utility plant.

WHAT WE DO

COMMERCIAL
HVAC & PLUMBING

INDUSTRIAL

BUILDING AUTOMATION

AEROSPACE

SERVICE & MAINTENANCE

STRUCTURAL STEEL

AWARDS


  • Builders Exchange of Central Ohio:
    Safety Achievement Award – 2008 to 2016
  • Builders Exchange of Central Ohio:
    Craftsmanship Award – 2012
  • Builders Exchange of Central Ohio:
    Cornerstone Award – 2012