Ohio Confidential Multi-Building Data Center Campus — New Albany, Ohio
Project Overview
Sauer Group served as mechanical contractor for a confidential data center campus in New Albany, Ohio. Designed to support large-scale data storage and mission-critical digital infrastructure, the project required extensive HVAC, industrial water piping, refrigeration, and plumbing systems across the full campus.
Across the combined scope, Sauer Group installed more than 160,000 linear feet of industrial water piping and more than 120,000 linear feet of refrigeration systems. The project also included large-scale penthouse air-handling units cooled by evaporative cooling systems, along with drainage systems and potable water infrastructure.
To meet aggressive project schedules, Sauer Group crews worked six days per week, ten hours per day while maintaining detailed QA/QC documentation throughout installation. This disciplined documentation and field execution helped support successful, on-time startup milestones across the campus.
Contract value
$180M (combined)
Completion
April 2020 through June 2026 (phased)
Sector
Data Centers / Mission-Critical Infrastructure
project type
Multi-Building Data Center Campus
schedule
6 days per week,
10 hours per day
Construction mgr
Turner
Construction Co.
Contract value
Sheehan Partners LTD; SNHA –
Woolpert Company
Jobsite
160,000+ linear feet of industrial water piping
120,000+ linear feet of refrigeration systems
Sauer role
Mechanical Contractor
Mechanical Engineer
Environmental Systems Design, Inc.
Reference contact
Turner Construction Co.
The Sauer Group Solution.
Large-Scale Piping Installation
Across the combined campus scope, Sauer Group installed more than 160,000 linear feet of industrial water piping and more than 120,000 linear feet of refrigeration systems. The work supported the data center’s cooling infrastructure and required careful sequencing across the phased campus buildout.
Mission-Critical HVAC Systems
The project included large-scale penthouse air-handling units cooled using evaporative cooling systems. Additional equipment and systems included multi-trade racks, MCUPs, dry coolers, fan coils, technical water, facility water, condensing water, and refrigerant piping.
Schedule-Driven Execution
Sauer Group crews worked a six-day, ten-hour-per-day schedule to maintain progress and support aggressive project milestones. This sustained field effort helped keep the mechanical scope aligned with the broader campus construction schedule.
QA/QC Documentation for Startup Readiness
Sauer Group teams followed a stringent QA/QC process that required detailed documentation of installation work. This approach helped verify work quality, support commissioning, and ensure startup readiness.
Project Results.
$180M
Combined mechanical contract value
160,000+ LF
Industrial water piping
120,000+ LF
Refrigeration systems
6×10 Schedule
Six days per week, ten hours per day
Campus-Scale Delivery
Phased data center buildout
QA/QC Documented
Detailed installation records supporting startup readiness
More of our Projects.
Large-scale mechanical construction for a confidential 3,000,000 SF hybrid/electric vehicle battery manufacturing facility, including plant cooling infrastructure, refrigeration systems, and welded industrial piping.
Upgraded the medical vacuum system for the new Wexner Medical Center, installing new risers and branch lines, area alarm systems, and connections to zone valve boxes, integrating with existing infrastructure and completing all work while the hospital remained fully operational.
Provided full Design Assist mechanical services for a 290,454 SF pharmaceutical manufacturing and laboratory facility, including central utility plants, high-purity process piping, and cGMP-compliant HVAC systems.