Sauer Group, LLC: Columbus, OH
1105 Schrock Road, Suite 700
Columbus, OH 43229
P: 614.853.2500
F: 614.853.6131

Call Us
Map
FAQ

Confidential Data Center
Campus

Columbus, OH

Ohio Confidential Multi-Building Data Center Campus — New Albany, Ohio

Project Overview

Sauer Group served as mechanical contractor for a confidential data center campus in New Albany, Ohio. Designed to support large-scale data storage and mission-critical digital infrastructure, the project required extensive HVAC, industrial water piping, refrigeration, and plumbing systems across the full campus.

Across the combined scope, Sauer Group installed more than 160,000 linear feet of industrial water piping and more than 120,000 linear feet of refrigeration systems. The project also included large-scale penthouse air-handling units cooled by evaporative cooling systems, along with drainage systems and potable water infrastructure.

To meet aggressive project schedules, Sauer Group crews worked six days per week, ten hours per day while maintaining detailed QA/QC documentation throughout installation. This disciplined documentation and field execution helped support successful, on-time startup milestones across the campus.

lco img01

Contract value

$180M (combined)

Completion

April 2020 through June 2026 (phased)

Sector

Data Centers / Mission-Critical Infrastructure

project type

Multi-Building Data Center Campus

schedule

6 days per week,
10 hours per day

Construction mgr

Turner
Construction Co.

Contract value

Sheehan Partners LTD; SNHA –
Woolpert Company

Jobsite

160,000+ linear feet of industrial water piping
120,000+ linear feet of refrigeration systems

Sauer role

Mechanical Contractor

Mechanical Engineer

Environmental Systems Design, Inc.

Reference contact

Turner Construction Co.

The Challenge

This confidential data center campus required Sauer Group to execute large-scale, mission-critical mechanical systems while supporting fast-moving construction schedules and rigorous startup requirements.

  • Campus-Scale Mechanical Volume

    The combined scope included more than 160,000 linear feet of industrial water piping and more than 120,000 linear feet of refrigeration systems. Managing this volume required disciplined planning, skilled field labor, and close coordination between Sauer’s project teams and construction partners.
  • Mission-Critical Cooling Requirements

    The facilities were designed to support high-density data storage operations, requiring reliable HVAC and cooling infrastructure. Sauer’s scope included large-scale penthouse air-handling units cooled with evaporative cooling systems, along with technical water, facility water, condensing water, and refrigerant piping.
  • Aggressive Schedule Demands

    The project required Sauer crews to work six days per week, ten hours per day to complete the work within aggressive construction schedules. Maintaining momentum across the campus required consistent manpower planning, material coordination, and field leadership.
  • Documentation-Heavy QA/QC

    A stringent QA/QC system required Sauer teams to document installations in detail. This documentation supported quality control, commissioning readiness, and on-time startup milestones.

Scope of Work

HVAC & Cooling Systems

  • Large-scale penthouse air-handling units
  • Evaporative cooling systems
  • Multi-trade racks
  • MCUPs
  • Dry coolers
  • Fan coils

Industrial Water & Refrigeration Piping

  • 160,000+ linear feet of industrial water piping
  • 120,000+ linear feet of refrigeration systems
  • Technical water piping
  • Facility water piping
  • Condensing water piping
  • Refrigerant piping

Plumbing Systems

  • Drainage systems
  • Potable water systems

The Sauer Group Solution.

Large-Scale Piping Installation

Across the combined campus scope, Sauer Group installed more than 160,000 linear feet of industrial water piping and more than 120,000 linear feet of refrigeration systems. The work supported the data center’s cooling infrastructure and required careful sequencing across the phased campus buildout.

Mission-Critical HVAC Systems

The project included large-scale penthouse air-handling units cooled using evaporative cooling systems. Additional equipment and systems included multi-trade racks, MCUPs, dry coolers, fan coils, technical water, facility water, condensing water, and refrigerant piping.

Schedule-Driven Execution

Sauer Group crews worked a six-day, ten-hour-per-day schedule to maintain progress and support aggressive project milestones. This sustained field effort helped keep the mechanical scope aligned with the broader campus construction schedule.

QA/QC Documentation for Startup Readiness

Sauer Group teams followed a stringent QA/QC process that required detailed documentation of installation work. This approach helped verify work quality, support commissioning, and ensure startup readiness.

lco img05
lco img04
lco img03

Project Results.

$180M

Combined mechanical contract value

160,000+ LF

Industrial water piping

120,000+ LF

Refrigeration systems

6×10 Schedule

Six days per week, ten hours per day

Campus-Scale Delivery

Phased data center buildout

QA/QC Documented

Detailed installation records supporting startup readiness

More of our Projects.

Confidential Battery Facility

Hybrid/Electric Vehicle Battery Plant

Large-scale mechanical construction for a confidential 3,000,000 SF hybrid/electric vehicle battery manufacturing facility, including plant cooling infrastructure, refrigeration systems, and welded industrial piping.

OSU WMC

OSU Wexner Medical Center

Upgraded the medical vacuum system for the new Wexner Medical Center, installing new risers and branch lines, area alarm systems, and connections to zone valve boxes, integrating with existing infrastructure and completing all work while the hospital remained fully operational.

Pharma facility

Confidential Pharmaceutical Facility

Provided full Design Assist mechanical services for a 290,454 SF pharmaceutical manufacturing and laboratory facility, including central utility plants, high-purity process piping, and cGMP-compliant HVAC systems.

Built in Columbus. Built to Last.

Build With Us.
Sauer Group construction site with workers and equipment.

Sauer Group: Columbus, OH
1105 Schrock Road, Suite 700
Columbus, OH 43229
P: 614.853.2500
F: 614.853.6131

  • Home
  • Capabilities
  • Projects
  • About Us
  • Contact Us

Full service Mechanical Contracting Company providing HVAC, Industrial Piping, Plumbing, Instrumentation, and Controls. Sauer Group has provided contracting services for projects up to $40,000,000 for Fortune 500 companies throughout the Midwest and Mid-Atlantic since 1876. Sauer Group has an automated 40,000 sq. ft. pipe and skid fabrication shop in Columbus, Ohio, which is capable of producing assemblies up to 60" in diameter and 40' in length, as well as an 80,000 sq. ft. fabrication facility in Davisville, West Virginia that expands its capacity for large-scale industrial fabrication and modular assembly projects. Sauer Group is committed to delivering a high level of customer service and to establishing long-term, mutually beneficial business relationships. Sauer Group has over 650 team members in its Columbus, Ohio territory and can help find the best solution for your next project.